Modernisation of the Swinoujscie – Szczecin fairway to a depth of 12.5 m
Design and execution of construction and dredging works as part of the „Modernisation of the Swinoujscie – Szczecin Fairway to a Depth of 12.5 m” consists of the widening to a minimum of 100 m and deepending to a depth of 12.5 m of the current channel along with:
- reconstruction of the shoreline slopes without fortifications
- bottom leveling in the Swinoujście zone
- construction and reconstruction of bank fortifications and hydrotechnical structures together with the adjacent infrastructure
- deepening and widening of the turntables for ships and construction of additional hydrotechnical structures
The project was completed in cooperation with Partners - International Marines and Dredging Consultants and Projmors Designing Office For Maritime Structures Company Limited.