Design documentation and author's supervision for the project: The DN1000 MOP 8.4 MPa high pressure gas pipeline on the sections from ZZU Czeszow to the Kielczow node.

The pipeline works in the transmission system.
 

Scope of work

  • obtaining an environmental decision
  • obtaining a location decision
  • execution of the basic design
  • execution of the detailed design
  • obtaining a building permit

Client

OGP Gaz-System S.A.
 

Period of completion

2013-2018