Design documentation and author's supervision for the project: The DN1000 MOP 8.4 MPa high pressure gas pipeline on the sections from Tworog to Tworzen.

Scope of work

  • obtaining an environmental decision
  • obtaining a location decision
  • execution of the basic design
  • execution of the detailed design
  • obtaining a building permit

Client

OGP Gaz-System S.A.
 

Period of completion

2015 - 2021