Preparation of design documentation for investment "Gas pipeline Skoczow-Komorowice-Oswiecim-Tworzen with accompanying infrastructure divided into 3 parts".

Scope of work

The aim of this task is to prepare a complete design documentation, including: preliminary design, construction design and multi-optional detailed designs, together with obtaining a decision on environmental conditions and on establishing the location of the investment and building permits, as well as performing author's supervision.

Agreement I

Under one of the agreements signed, a 700 mm diameter Oswiecim - Tworzen gas pipeline will be designed together with a system reduction and measurement station in Oswiecim with a throughput of 300,000 m3/h. The building permit for this project is planned to be obtained in the first quarter of 2021.

Agreement II

As part of a separate contract, we will design a system station for reduction and measurement of Tworzen. It will be built in the Slawkow commune and will enable the connection of the transmission network currently under construction within the North-South gas corridor with the already existing transmission infrastructure of The station will design a piston transmission lock for the connection to the Oswiecim - Tworzen gas pipeline. The design of the station is to ensure its two-stage expansion. In the first stage, the station's capacity will be 200,000 m3/h, and in the second stage - 400,000 m3/h.